EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
rtardiff
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (515)
Research
- (32)
Workshop
- (39)
Empennage
- (3)
Fuselage
- (25)
Firewall
- (2)
Tail Feathers
- (14)
Wings
- (99)
Controls
- (36)
-
Trim Controls
-
Pedals
-
Reassembly
-
Throttle
-
Throttle Linkage
-
Trim System Reboot.6
-
Trim System Reboot.5
-
Trim System Reboot.4
-
Trim System Reboot.3
-
Trim System Reboot.2
-
Trim System Reboot.1
-
Trim actuators
-
Reassembly
-
Trim
-
Ailerons
-
Throttle
-
Throttle, revisited
-
Pulley Guards
-
Push to Talk;...
-
Push to Talk
-
Rudder Cables--Forward
-
Rudder cables
-
Trim cable, fuel...
-
Trim Control
-
Trim Control
-
Trim Control Relocated
-
Nicopress Success
-
Cables, etc.
-
Let's just call it...
-
Is it sweg or swag?
-
Throttle Quadrants.2
-
More cables
-
Cables, etc.
-
Pulleys, Pulley...
-
Control Stick
-
Rudder Pedals, Flap...
Avionics
Lighting
Instrument Panel
- (2)
Landing Gear
- (9)
Engine
- (8)
Propeller
- (8)
Fuel System
- (29)
Interior Finish
- (22)
Paint / Decals
- (33)
Inspection
- (6)
Tools
- (5)
Bootcowl
- (30)
R&R
- (4)
Covering
- (46)
Brakes
- (3)
Windows
- (11)
Instruments
- (3)
Paint Booth
- (9)
Paint Prep.
- (21)
Cowling
- (16)
Builder Name:
Richard Tardiff
-
Project:
Bearhawk - Patrol
-
VIEW REPORTS
Total Hours:
2319.25
Total Flight Time:
0.7
Total Expense:
$39.00
Start/Last Date:
Aug 10, 2019 - No Finish Date
Engine:
Lycoming 0360
Friendly URL:
https://eaabuilderslog.org?s=rtardiff
Home or Last Project Picture
Jun 13, 2022
Throttle
- (2 hours)
Category: Controls
Reinstalled connecting rod between fore and aft throttles. Would have been much easier before I glued the fabric on!
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.